MRT Last Train – Sungai Buloh Kajang Line

MRT Last Train - Sungai Buloh Kajang Line

MRT Last Train – Sungai Buloh Kajang Line

The line has 31 stations along a 51km route including 7 underground stations below the city center.  Estimated traveling time for the entire stretch is 86 minutes.

Trains are operating at a frequency of 3.3 minutes during peak hours. The MRT line is being operated by Rapid KL just like the LRT, Monorail and bus network.

Ticket Prices:
between RM 1.10 and RM 6.40

MRT Last Train

Station Opening Hours : Stations will be opened to public at 0600 hours every day except if there is approved event that need specific station (s) to be opened earlier than normal.

Stations closing time will be varies from each station. Once the station roller shutter has been closed, passenger shall exit the station via the “bypass” door. Customers are advisable to enter the station before station closing time. The bypass door is only for the customer to exit the station.

Station Closing (Monday to Saturday)

MRT Last Train

Read: Kuala Lumpur LRT, MRT, ERL, KTM Komuter & Monorel Map (Updated 2019)

Station Closing (Sunday and Public Holiday)

MRT Timetable Sungai Buloh – Kajang Line

Note: In the event of any approved service extension hours or special-request events, dedicated train schedule and operation plan will be introduced.

This is also include the unique operations i.e. Ramadhan operations, where the timing for the morning and evening peak hours have some slight changes.

Please be at the station before closing time.

Source: MRT Malaysia

MRT Last Train – Sungai Buloh Kajang Line MRT Last Train – Sungai Buloh Kajang Line MRT Last Train – Sungai Buloh Kajang LineMRT Last Train – Sungai Buloh Kajang Line mrt timetable,mrt map malaysia,mrt kajang,mrt map malaysia 2019,mrt route,mrt malaysia fare,mrt line 2,mrt bukit bintang, mrt map, mrt in malaysia, mrt line, mrt station, mrt kl map, mrt map kl mrt kajang, mrt route map, mrt opening hours, mrt opening hour

MRT Timetable & Route Sungai Buloh – Kajang Line

MRT Timetable Sungai Buloh – Kajang Line

MRT Timetable & Route Sungai Buloh – Kajang Line

Malaysia’s first MRT, the 51km SBK Line was handled from conceptualisation to completion by joint venture MMC Gamuda under the project delivery partner (PDP) model.

The world’s first variable density tunnel boring machine (VD-TBM) was deployed for the underground portion of the alignment. With a total of 31 stations, the SBK Line is a symbol for greater and more seamless urban connectivity in Malaysia with an estimated ridership of 40,000 per day.​

MRT Timetable

Station Opening Hours : Stations will be opened to public at 0600 hours every day except if there is approved event that need specific station (s) to be opened earlier than normal.

Stations closing time will be varies from each station. Once the station roller shutter has been closed, passenger shall exit the station via the “bypass” door. Customers are advisable to enter the station before station closing time. The bypass door is only for the customer to exit the station.

Station Closing (Monday to Saturday)

Station Closing (Sunday and Public Holiday)

MRT Timetable Sungai Buloh – Kajang Line

Note: In the event of any approved service extension hours or special-request events, dedicated train schedule and operation plan will be introduced. This is also include the unique operations i.e. Ramadhan operations, where the timing for the morning and evening peak hours have some slight changes.

Please be at the station before closing time.

Read: Kuala Lumpur LRT, MRT, ERL, KTM Komuter & Monorel Map (Updated 2019)

MRT Route / Line / Station

It’s thirty-one stations! Travelers or citizens coming from different parts of the city will have easier access to the 51-Kilometer long line system.

Each station is located near hospitals, universities, parks, and work institutions; which makes the MRT a recommended means of transportation for those who commute every day.

MRT Timetable Sungai Buloh – Kajang Line
  • Sungai Buloh
  • Kampung Selamat
  • Kwasa Damansara
  • Kwasa Sentral
  • Kota Damansara
  • Surian
  • Mutiara Damansara
  • Bandar Utama
  • Taman Tun Dr Ismail
  • Phileo Damansara
  • Pusat Bandar Damansara
  • Semantan
  • Muzium Negara
  • Pasar Seni Merdeka
  • Bukit Bintang
  • Tun Razak Exchange
  • Cochrane
  • Maluri
  • Taman Pertama
  • Taman Midah
  • Taman Mutiara
  • Taman Connaught
  • Taman Suntex
  • Sri Raya Bandar
  • Tun Hussein Onn
  • Batu Sebelas Cheras
  • Bukit Dukung
  • Sungai Jernih
  • Stadium Kajang
  • Kajang

MRT Fares (as at 30 Nov 2018)

Rail Fare Calculator (Klik)

Source: MRT Corp

mrt timetable, mrt map malaysia, mrt kajang, mrt map malaysia 2019, mrt route, mrt malaysia fare, mrt line 2, mrt bukit bintang, mrt station, mrt line, mrt map, MRT Timetable & Route Sungai Buloh – Kajang Line